We got lucky. The rain broke for the exact three hours we worked on the boat. We were able to complete most of the final items. The spar is up and completely rigged. The grab rails have been reinstalled. The head is operational and the gear has been loaded for the delivery.
We will work one last time this Saturday at 10am to finish everything. One final push before the delivery. We could really use as many hands as possible so please try to make it.
Items remaining on the list:
Sikaflex hull deck joint
install lead bars
re-seat bulls eye on deck
replace out hall eyelet
sikaflex u-bolt on pole tip
fantastic hull and apply #3 coat to gel-coat