Under the sun on a beautiful day; Tom, Gyt, Steve, Andy & Keith got a lot of work done this past Saturday. The hull has been sanded and the interior cleaned. We installed the electronics, batteries, dodger and wheel. All lines have been loaded onto the boat and are ready for next week's work party. The mast was checked and all halyards have been run.
The mast should be stepped by next weekend.
Our plan is to meet at 12pm Saturday 4/12/08.
The work list for next week:
- Rigging boom, boom-vang, main-sheet and traveler.
- Complete wheel install
- Load sails
- Clean bilge & head
- Lube winches
- Fix B&G display